- Level
- A little practice
- Time
- 45 min before, 30 min after
- Crew size
- 4-6 people
- Standing depth
- ~21 in. treads
- Lock check
- Front-back AND side-to-side
- Lifts
- Two people, always
Quick start
- 1
Unfold one section at a time
Modern standing risers open like an accordion. Let the gas-spring mechanism control the motion — you're guiding it, not forcing it. Keep fingers off the hinges.
- 2
Lock every level both ways
Each tier latches front-to-back and side-to-side. Don't assume — physically seat each latch until it clicks home.
- 3
Attach the back rail
The top row gets a back rail so singers on the highest tier can't step off the back edge. It's not optional; it's the one piece that prevents a fall.
- 4
Push-test the whole stack
Grab the unit with both hands and rock it hard. If anything wobbles or shifts, re-seat the latch before a singer ever climbs up.
- 5
Strike in reverse, under control
After the concert: clear the deck, fold each section slowly so the spring takes the weight, and roll everything back to storage.
Watch first
Choir risers are the tiered platforms that lift the back rows so every singer is seen and every voice carries over the row in front. They look heavy and complicated, but the work is rhythmic and quick to learn — unfold, lock, rail, test, repeat. The whole job is built around one promise: nobody stands on a riser that isn't fully locked.
- 1
Clear and plan the floor
Mark where the risers go based on the director's staging — tallest sections often go center-back. Leave a clear path for singers to file on and off.
- 2
Unfold section by section
Open one unit at a time. Let the gas-spring assist control the motion — moderate foot pressure, then guide it open. Hands away from the pinch points.
- 3
Lock all levels
Seat every latch front-to-back and side-to-side. Walk the line and physically confirm each one.
- 4
Attach back rails and any steps
Top-row back rail goes on every time. If you're using access steps with a handrail, lock those too.
- 5
Push-test
Rock the assembled stack hard with both hands. Re-seat anything that moves before the choir loads on.
- 6
Strike after the concert
Clear the deck first, fold each section under control so the spring takes the weight, and roll to storage. Two-person lifts on anything heavy.
- Why tiers
- Lift back rows so every voice carries over the row ahead
- Standing depth
- ~21 in. treads on most modern units
- Pinch points
- Hinges during fold/unfold — keep fingers clear
- Back rail
- Required on the top tier, every time
- Heavy items
- Two-person lift, no exceptions
- Every level locked front-to-back and side-to-side
- Top-row back rail attached
- Access steps (if used) locked with handrail
- Whole stack push-tested and solid
- Floor path clear for singers to file on and off
- After strike: risers folded, rolled back, and stored; deck and floor clear
More resources
Sources: Choral riser manufacturer setup and safety specs (Midwest Folding, SICO, StageRight); American Choral Directors Association (ACDA)